Increased the capacity of Sulphur granulation plant by installing a new train (tanks, double jacketed piping, steam piping, pumps and steam traps). The scope included basic engineering, detail design and installation.
Replacement of process equipment i.e. heat exchangers,
piping, pressure vessels, valves and pumps.
Detail design of process equipment and piping, fitness for services analysis, re-rating of equipment, repair methods and procedures, procurement of equipment.
Civil / Structural Engineers on Repair and Maintenance of the facility Design, documentation and supervision on construction/repair and maintenance of prison facilities, including, building works and civil infrastructure (roads, storm water, sewer and water reticulation.
Structural Due diligence / assessment of various projects
for investing with a view of upgrades & refurbishments.
Support the maintenance team with the following activities